Laserfiche WebLink
I . PHASING OF PROJECT <br /> Phase Time Period Activity <br /> I _ 1st Year Construct fruit stand, & park and ride <br /> 2nd Year Build fast 70od restaurant or type <br /> station on - <br /> 3rd Year As the market demands <br /> A . GENERAL <br /> 1. Size of Project Area 50 acres, more or less <br /> 2 . Average Slope: 0-5% X , 6-10% , 11-20% more than 20% <br /> 3 . Uses (structures , crops , etc . ) Seasonal / row crops <br /> 4 . Uses in the Immediate Vicinity <br /> North Agriculture South Agriculture <br /> East Agriculture West Agriculture <br /> 5 . Property Description ( shape, terrain, unique features , etc . ) <br /> _ Project parcel is rectangular in shape, and is nearly level to gently <br /> sloping Present use is for agriculture. <br /> 6 . Specify waterways or irrigation on property or continguous <br /> property <br /> Existing drainage ditches to be rerouted as required. <br /> 7 . Specify any easements or utility rights-of-way None <br /> B. ENVIRONMENT <br /> 1. Vegetation on site ( oaks , riparian vegetation , etc . ) <br /> Seasonal / row crops <br /> 2 . Rare or endangered animals or plants None <br /> 3 . Subject to flooding, poor drainage, or other natural hazard <br /> Property subject to flooding during 100 year storm events <br /> 4 . Historic or archaeological resources , scenic aspects , or sand <br /> or gravel resources None <br /> -5- ( 9/85 ) <br /> Plan-44 <br />