Laserfiche WebLink
8 . If the project will use significant amounts of any of the <br /> following, estimate amount or note that a large amount will be <br /> consumed: <br /> a . water N/A C. natural gas N/A <br /> b. electricity N/A <br /> 9 . Describe any discharges into surface waters ( including intermit- <br /> tant streams ) None <br /> 10 . Will the project result in substantial air emissions or <br /> deterioration of ambient air quality? X NO YES <br /> 11. Will there be objectionable odors? X NO YES <br /> 12 . Describe any alteration of air movements , moisture, or tem- <br /> perature , or any change in climate, either locally or <br /> regionally None <br /> 13 . Specify any hazardous materials which will require storage , <br /> disposal , or transportation None <br /> 14 . Describe any exposure of people to noise , hazardous materials or <br /> situations Exposure to I-5 traffic noise <br /> 15 . Describe any displacement of people as a result of the project <br /> None <br /> 16 . Describe any congestion which might occur on roadways or at <br /> interchanges or intersections as a result of the project <br /> Traffic will increase on Manthey Road. <br /> B. MITIGATION MEASURES <br /> If any environmental impacts were described in the previous section, <br /> list and describe measures proposed to minimize the impacts . (Attach <br /> additional pages , if necessary. Use the following format . ) <br /> 1 . Impact Exposure to I-5 traffic noise - #14 <br /> Mitigation Measures Activity in the area close to I-5 should be inside of <br /> structures, i .e restaurants, deli , and gift shop. Outside activity ur er <br /> from I-5 i .e. , and RV park will be buffered from noise of landscaping. <br /> 2. Impact - Traffic to increase on Manthey Road. Mitigation measures - discussions <br /> with Caltrans to upgrade on and off ramps in this vicinity are in <br /> progress. <br /> -7- ( 9/85 ) <br /> n i <br />