My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
SITE INFORMATION AND CORRESPONDENCE_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 11:20:52 AM
Creation date
6/4/2020 11:17:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Harlin Knoll [EH] <br /> From: Catherine Francini [cfrancini@secor.com] <br /> Sent: Thursday, September 27, 2007 6:52 PM <br /> To: Harlin Knoll (EH] <br /> Cc: Brad Shelton <br /> Subject: 11194 Tracy 2375 N Tracy Blvd <br /> Hello Harlin, <br /> Thanks for the voice message regarding closure at 11194. I've been in and out of the office sick this week; <br /> sorry I'm returning your call so late. <br /> 1. Status of ConocoPhillips lease at 2375 N. Tracy Blvd.: I contacted Conoco regarding this and they are <br /> woridering what information you would like to know. I have a note that you spoke with a Dick or Jan <br /> previously about the site lease status. <br /> 2. MW-9 well was installed on March 30, 2007 and has been sampled twice since installation. The well was <br /> developed and sampled for the first time on April 7, 2007. Unfortunately the new well was not added to <br /> the 2Q sampling request and was not sampled during the 2Q07 sampling event. The well was sampled during <br /> the 3Q07 sampling event on July 24-25, 2007. <br /> 3. MW-4 had a MtBE hit of 8.3 2Q07 and 1.9 3Q07 <br /> 4. MW-7's only hit was 1.1 for MtBE 3Q07 <br /> I have all this information available for discussion if you would like. <br /> Thanks so much with all of your help. <br /> Best regards, <br /> Cat <br /> Catherine Francini <br /> Project Manager <br /> Secor International Incorporated <br /> 3017 Kilgore Road, Suite 100 <br /> Rancho Cordova, CA 95670 <br /> 916.861.0400 ext. 320 OFFICE <br /> 916.861.0430 FAX <br /> 916.384.0782 DIRECT <br /> 9/28/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.