Laserfiche WebLink
or <br /> x <br /> UNIT IV LOP <br /> NO FURTHER ACTION {NFA} CLOSURE CHECK LIST <br /> 91 <br /> SITEADDRESS: J ole <br /> LOP STAFF: - i✓ <br /> SITE NAME: <br /> DATE: 741 <br /> 5/31 DI I NFA requested by RP or LOP Staff reviewed site with PG and determined it qualifies for NFA. <br /> LOP Staff verified GeoTracker(GT) "Closure Review" screen still marked "No" at"is This Case Ready for Closure?' <br /> OL18LIL LOP Staff advises CVRWQCB of NFA consideration. <br /> S LOP staff and PG/PC discuss NFA consideration with CVRWQCB at Unit Meeting, by phone, or e-mail. <br /> 2" I LOP Staff drafts Case Closure Summary(CCS). <br /> '1 1 LOP Staff has CCS verified by 'third party' staff member. CCS Reviewed by/Z <br /> 8 LOP Staff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA that includes the CCS. <br /> I t1 LOP Staff submits 30-day CVRWQCB NFA with CC to wa er purveyor to PC for review and signature. <br /> Copy of 30-day letter and CCS sent to: C, 19 T alt _ I'L- (name of water purveyor) <br /> CVRWQCB 30-day response date up on: _Q2::% 11 concurrence received on: IS tr <br /> 30-day extension requested to: AA Non-concurrence letter from CVR Cb Management <br /> received on: is lTt Staff up loads CVRWQCB letter without CCS into GT on 210 <br /> which begins Public Participation Notice notification of 35 days. <br /> 8I> �Documentation received, filed, and flagged that indicates the"current record owner(s) of fee title to the site have <br /> been notified", per Section 25297.15 (a). The NFA closure letter may not be issued without this <br /> documentation. <br /> it L LOP Staff directs RP to destroy all wells, remove all site waste material, and provide documentation that the waste <br /> material was properly disposed, LOP staff reviews and approves work plan for well de ucf} n. Destruction permits <br /> issued after 60 days of posting of the Closure Public Notice. Permits issued on 3Df t Z <br /> } ll l LOP Staff documents destruction of all monitoring wells. GT"Groundwater Monitoring" screen updated to indicate <br /> wells are destroyed. The NFA closure letter may not be issued until wells are destroyed. <br /> LOP Staff verifies and flags documentation received indicating all onsite waste material removed and properly <br /> disposed and verified with EHD accounting all SR& D site fees have been paid. The NFA closure letter may <br /> not be issued without this documentation. GT"Closure Review" screen marked "Yes" at"Is This Case Ready <br /> for Closure?" <br /> XA_ <br /> PGIPC reviews file with flagged documents by LOP Staff and approves clerical issuance of NFA and CCS for <br /> Director's signature. <br /> I LOP staff provides name and addresses of all RPs to the Clerical. Clerical generates a NFA and CCS to be signed <br /> by Director for each RP (not consultants). NFA& CCS generated only if PGIPC signed off above. Signed CCS <br /> and NFA are copied. Originals mailed to RP. Copies filed into LOP File, given to Management, and given to staff to <br /> upload into GT. <br /> Clerical staff updates Envision to reflect site is Closed. <br /> LOP staff pulls all site files for clerical staff to file in LOP Closed File cabinets until scanned into Questys. <br /> LOP staff updates GT"Project Information" screens to reflect site status as Closed. <br />