Laserfiche WebLink
( S E C 0 R - <br /> SJCEHD <br /> December 8, 2006 <br /> Page 4. <br /> If there are any questions regarding this work plan, please call us at (916) 861-0400. <br /> Sincerely, <br /> SECOR International Incorporated <br /> Prepared by: Reviewed;by: <br /> Brad Shelton P.G. Catherine Spelis <br /> Project Geologist Project Manager <br /> rJ <br /> Attachments: Figure 1 - Site Location Map <br /> Figure 2 - Site Plan with Proposed Monitoring Well Location <br /> Attachment A— Regulatory Correspondence, May 27, 2005 <br /> Attachment B— URS Corporation Workplan, July 12, 2005 <br /> Attachment C— Updated Sensitive Receptor Survey, December 12, 2005 <br /> Attachment D— Field and Laboratory Procedures <br /> Attachment E— Monitoring Well Permit Application and Fee <br /> cc: Ms. Shelby Lathrop, ConocoPhillips (Electronic Upload into Webextender) <br /> Mr. Don Pratt,Atlantic Richfield Company(a BP affiliated company)(Electronic Upload into <br /> Enfos) <br /> I:1BP-ARC0105 BP-COP Sites1111941Work Plan111194 Vertical Delineation WP.doc <br />