Laserfiche WebLink
First Quarter Monitoring and Sampling Report, 1993 May 19, 1993 <br /> Southland Site No 20680, 9110 Thornton Road, Stockton, CA 5 <br /> Services to be performed by Groundwater Technology during the second quarter 1993 are as <br /> follows <br /> ■ Monthly domestic well sampling <br /> ■ Quarterly monitoring and sampling of monitoring wells <br /> This concludes the Groundwater Technology, Inc First Quarter Mgndoring and Sampling Report <br /> 1993 for Southland Site No 20680 at 9110 Thornton Road in Stockton, California <br /> Sincerely, <br /> I Groundwater Technology, Inc. Groundwater Technology, Inc. <br /> Written/Submitted by Reviewed/Approved by <br /> �t4� K QFo <br /> Rick Hughes Davit R Kleesattei r.p <br /> Environmental Scientist Registered Geologist <br /> No 5136 <br /> I DAViD R KLEEUTIEL <br /> For W 5136 <br /> John S Gaines <br /> Sandra L Lindsey Vice President, General oQ� <br /> Project Manager West Region F C M-N* <br /> RH SLL ly <br /> Attachment 1 Figures <br /> Attachment 2 Tables <br /> Attachment 3 Groundwater Technology, Inc Standard Operating Procedures <br /> Attachment 4 Analytical Results of Groundwater Samples <br /> Attachment 5 Historical Summary of Laboratory Results of Total Petroleum <br /> Hydrocarbons-as-Gasoline <br /> Attachment 6 Domestic Well Historical Laboratory Results <br /> I <br /> ezyiaozs <br /> GROUNDWATER <br /> I <br /> _L—_TECHNOLOGY, INC <br />