My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9172
>
3500 - Local Oversight Program
>
PR0545728
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 11:54:13 AM
Creation date
6/4/2020 11:40:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545728
PE
3528
FACILITY_ID
FA0006203
FACILITY_NAME
WALTS AUTO REPAIR
STREET_NUMBER
9172
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
9172 THORNTON RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> ��VvMA <br /> RESNA Industries Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised November 1992 <br /> 11.3 Sampling from Soil Piles or Shallow Soil Pits <br /> Soil samples will be collected and transported from excavated material in the manner <br /> described in the previous section, however, a backhoe will not be utilized. If composite <br /> samples are collected, four brass cylinders will be collected for every 50 cubic yards of <br /> material to be sampled unless otherwise specified by the lead regulatory agency. The <br /> samples will be composited by the state certified laboratory personnel prior to testing. <br /> 12.0 GROUNDWATER SAMPLING PROTOCOL <br /> Prior to arriving at the sampling site, all sampling equipment will be washed with laboratory <br /> grade detergent, and rinsed twice with tap water, once with acetone, and once with deionized <br /> water. this procedure will be carried out on-site before sampling of other monitoring wells, if <br /> more than one well is to be sampled with the sample sampling device. <br /> Immediately prior to sampling, the depth to water (DTW) in the well will be recorded. The <br /> thickness of product on top of the groundwater, if present, will be measured using an interface <br /> probe. The procedure for monitoring is presented in Section 9.0 (Groundwater Monitoring <br /> Protocol). <br /> If free product is detected, analysis of groundwater at the interface for dissolved product will <br /> not be conducted. A product sample will be collected for source identification. If all free <br /> product cannot be removed, an interval specific sampling device may be utilized to collect a <br /> sample from below the zone of free product. Before collecting groundwater samples from each <br /> well, the well will be purged until indicator parameters (temperature, conductivity, and pH) <br /> stabilize. This will entail the removal of at least four well casing volumes by bailing or <br /> pumping. The criteria for determining well casing volumes and temporary storage of purged <br /> water is outlined in Section 10.0 (Well Development Protocol). The indicator parameter <br /> QAQcIM.FNL 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.