Laserfiche WebLink
Au <br /> BACKFILL EXCAVATION CERTIFICATE <br /> i <br /> Project Location <br /> Owner Phone No. <br /> Contractor Phone No. License No. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in <br /> the excavation in 12" lifts: <br /> A. Pea gravel—smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock—self-compacting material not more than three-quarters (314) inch in cross sectional <br /> measurement. (Use of crashed rock will not be permitted-for backfill if contact will be [Wade between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofroject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entireiexcavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> * <br /> Name t <br /> Title- t <br /> tgnature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />