Laserfiche WebLink
Work Plan for Soil Excavation Additional Assessment <br /> / a <br /> Barbara Drake,26485 North Thornton Rd.,Thornton,CA October 6, 1994 <br /> TASK 5: REPORT PREPARATION <br /> Groundwater Technology will prepare a report summarizing the data collected under the scope of <br /> Work detailed above. The report will document the methods and results of the work, summarize <br /> laboratory analytical results, and Include appropriate maps. } <br /> PROJECT SCHEDULE <br /> r <br /> Groundwater Technology Is prepared to begin work on this project within two weeks of work plan <br /> approval by the SJCPHS-EHD. The report will be submitted approximately four weeks after the <br /> receipt of all laboratory analytical results. <br /> REFERENCES <br /> Wallace and Kuhl Associates, Inc., August 1994; Preliminary Investigation and Evaluation Report, <br /> 26485 North Thornton Road. <br /> Please contact our West Sacramento office at 916-372-4700 if you have questions or comments <br /> about this work plan. <br /> { <br /> Sincerely, <br /> Groundwater Technology, Inc. Groundwater Technolo , Inc. <br /> Submitted by: Approved Y: <br /> JSON M. FEDOTA K. SIMONIS, R.G. <br /> taff Geologist Senior Environmental Geologist <br /> Project Manager <br /> c: Mrs. Barbara Drake <br /> Mr. Howard J. Stagg, Attorney at Law <br /> Mr. Peter Allen, Aronson Engineering <br /> Attachments <br /> 1. Site Location Map <br /> 2. Site Map Showing Distributions of Hydrocarbons in Soil <br /> 0053SGA.WKP(MISC-15) <br /> ❑❑❑o GROUNDWATER <br /> ❑❑❑ TIJCHNOLOGY N <br /> E� <br />