My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
9015
>
3500 - Local Oversight Program
>
PR0545731
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 12:16:20 PM
Creation date
6/4/2020 11:56:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545731
PE
3528
FACILITY_ID
FA0004572
FACILITY_NAME
LOPEZ, ADOR
STREET_NUMBER
9015
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00114040
CURRENT_STATUS
02
SITE_LOCATION
9015 W WALNUT GROVE RD 11
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 AIR MONITORING AND CONFINED SPACE ENTRY <br /> 3.1 Air Monitoring <br /> Air monftodng must be performed on all sites in accordance with Groundwater Technology - <br /> practices. Organic vapor concentrations are monitored in the field with a flame ionization detector <br /> (FID) or photoionization detector (PID). All readings are taken in the workers' breathing zone to <br /> determine whether an action level has been met and/or exceeded. Air monitoring results must be <br /> documented on the Vapor Monitoring Form (Appendix B-3). <br /> Air monitoring action levels (Table 3-1) have been developed by Groundwater Technology to indicate <br /> the chemical concentrations in the breathing zone that require an upgrade in level of personal <br /> protective equipment (PPE). The action levels apply to all tasks performed on this site. Guidelines <br /> for frequency of air monitoring are presented In Table 3-2. <br /> -.-.,AIR MONITORING ACTIOII I..EYEL.S. " <br /> .Instrument* <br /> Function. _Measurement- .Action . <br /> Pttamionsa6on Detector(PSD) .:;... <br /> Hone kw action DetealnrD <br /> (F1 } ;,.6Aeas�xs�a iota!orgerwc wap�ora . <br /> 0-75 ppm Level D required <br /> 75-750 ppm Upprade to Level C <br /> >750 ppm Stop work. Contact PM and HSR for guidance. <br /> 0Kygen/CombLftnteter( /La) J&mmam anygan ie.,W ?and laver e3(;1i0sive tintit <br /> 0,2 18.S22% E Acoeptable conditions. Continue normal activity. <br /> Oz <19.5% = Ventilate the space. <br /> ■ Notity PM or HSR if unable to achieve acceptable <br /> conditions. <br /> Oz >22% . La ave cava inrnedmM9 y,this atmosphere is <br /> exvemely tiammabie. <br /> e Notify PM or HSR <br /> LEL <1D% . Acceptable conditions. Continue normal activity. <br /> LEL >10% . Leave area imrnediatety. <br /> ■ Contact PM or HSR for guidance on venting and <br /> other safety measures. <br /> Note: Yratrurnertts must be calibrated aceordimg to manutactureri <br /> LJLJU GROUNDWATER <br /> TECHNOLOGY <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.