Laserfiche WebLink
I <br /> BORING CONSTRUCTION DETAILpip GRLAPPHIC OG DESCRIPTION <br /> (ppmv) <br /> t 0 0 <br /> �e4e4eQaQe�o aggregate base <br /> I 1 1 Baa oo ao' <br /> Grout 4af�sQEr 1/2"crushed rock <br /> fl oQ C a <br /> ¢o0t7�00 <br /> I 2 2 Oaaf,7 Gao <br /> ookoaoko <br /> 8q > 8q <br /> GOOD COO <br /> Qo eQc <br /> F3 3 <br /> w X00 0X00 <br /> GOOD n <br /> a ooQo <br /> LU 4 4 aq'v a0 <br /> GOOD COa <br /> pC4p°n <br /> � <br /> 5 5 a00 D X40 <br /> OOtDd Oa <br /> O GQOvQC <br /> OL ria Q a <br /> 0 6 6 aaa as ao <br /> Goa O <br /> aQo vQO <br /> Oq Q 014m 7 7 GOOD Gan <br /> fl aLU 4 n <br /> pa0 0 X40 <br /> I GOOD pea <br /> 8 8 QO v4C <br /> as � oa <br /> Ga0D can <br />� 9 9 Qo oQC <br /> n4 n <br /> 0400 00 <br /> GQ P .0.D <br /> Ic oda o <br /> 10 10 �— <br /> light brown, sandy SILT (ML),dry, no odor <br /> I 11 11 <br /> L12 12 <br /> Itl , l , � , l , l � l <br /> Inch Radius 0 2 4 6 <br /> ILogged by Mark Bayes Drilling Company B&F Drilling Well Head Completton January 25 1993,14 45hra <br /> Project Mgr Paul Graft Dnlling Method Hollow Stem Auger Type of Sampler Calif Modified Split Spoon <br /> IDate Drilled January 25,1993 10 45 hrs Dniler Chris Finch TD(Total Depth) 30 4 Feel <br /> Explanation Contacts <br />■ = water level during drilling Solid where certain 0 <br /> IK7 Water level in completed well Dotted where approximate <br /> Boring Log JOB NUMBER <br /> EDLocation of recovered anti sample — — bashed where uncertain <br /> I Sod Bonng 1 10-92074 <br /> Location of sample sealed for Ile"" Haehured where gradational <br /> chemical analysis BORING <br /> est K Estimated permeabifrty <br /> I ® Sieve sample (hydraulic conductivity) Pacific Coast Producers <br /> 1K.primary 2K-secondary Lodi Cannery S B-1 <br /> ® Grab Sample Lodi, CA <br /> W No Recovery <br /> I <br />