My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
2450
>
3500 - Local Oversight Program
>
PR0545734
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 2:04:10 PM
Creation date
6/4/2020 2:53:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545734
PE
3528
FACILITY_ID
FA0010191
FACILITY_NAME
TRACY-PONTIAC-CADILLAC-GMC TRUCK
STREET_NUMBER
2450
STREET_NAME
TOSTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
238020-06
CURRENT_STATUS
02
SITE_LOCATION
2450 TOSTE RD
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
well. However, the scaled map that accompanied the recently submitted <br /> addendum placed this monitoring well some one hundred: nd forty feet north of <br /> the former tank pit area,..on an adjacent property. <br /> The addendum recommends that "four additional soil borings should be installed <br /> at the site by the procedures outlined in the Work Plan Addendum prepared-for <br /> this site, dated .06 ,lune 1597". The procedures outlined in the Work Plan <br /> Addendum 0f June 1997, for work that was completed on June 24, 1997, said a .i <br /> "Geoprobe rhaerasoil sampling assembly and a four-foot Teflon sleeve"would <br /> be.usedo. continuously collect soil samples. Is it the intention and/or , <br /> recommendation of Advanced Geo Environ mental, Inc. that the next phase of <br /> work at this site wili'be using.bath a ponventional hollow stem:auger drill rig, far <br /> th installation of:the fn hitoring well, and a Geoprobe unit,=for the additional soil: <br /> borings <br /> PHSIEHD agrees that the soil borings in this next phase of work should include <br /> contihuou.$1 pore sampling. The first boring, which should beplaced irrtrnediaWy° q <br /> :north of the excavatiorti area, between BJ-4 and B-5, should be drilled to at least. <br /> 85 feet.bsg to obtain soil.samples and a water sample for vertical definition of tire. <br /> contaminan#pii me <br /> Submit to PHS/EHD by January 15, :1.999a detailed, up t d te=in ork pian o <br /> complete the vertical and lateral assessment of the extent of the petroleum :. <br /> hydrocarbon contamination at this site. Include in the work plan.an up to date <br /> site specific Health and Safety Plan. Please note that this work plan:was r 1 <br /> originally requested onbctober 8, 1998 and was to be submitted to PHSIEHD by <br /> November 20,1998. <br /> If you have any questions call Lori Duncan at (209) 468-0337. <br /> Donna Heran, REHS <br /> Director, Environmental Health Division <br /> Lori Duncan, REHS Marga t Lagorio, HS <br /> Site Mitigation, Unit IV Supervisor, Unit IV ; <br /> :cc:" Mark List, CVRWQCB <br /> ':Bob Marty, AGE } <br />
The URL can be used to link to this page
Your browser does not support the video tag.