My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
2450
>
3500 - Local Oversight Program
>
PR0545734
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 1:20:26 PM
Creation date
6/4/2020 2:57:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545734
PE
3528
FACILITY_ID
FA0010191
FACILITY_NAME
TRACY-PONTIAC-CADILLAC-GMC TRUCK
STREET_NUMBER
2450
STREET_NAME
TOSTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
238020-06
CURRENT_STATUS
02
SITE_LOCATION
2450 TOSTE RD
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-31 October 2002 . r ; <br /> " AGE=NC Project No. 96-0254 <br /> s Page 7 of 7. N <br /> 1- q bentonite seal will.be formed by pouring bentonite chips Into the annulus and allowing them to settle F <br /> F <br /> on the filter-pack. Bentonite chips will be hydrated using five gallons of water: The bentonite chips 'F ; <br /> '_ �1 will be allowed to hydrate for a minimum-of one-half hour prior to grouting. F <br /> The remaining annular space will be filled to within one-foot of the ground surface with-a'cement ` <br /> I` , h grout. The'grout mixture will consist of type y Portland neat cement and not more than 6 gallons <br /> of water per 94-pound sack of cement.The-grout will be placed by pumping through a tremmie pipe k <br /> For inspection purposes, the'EHD will be notified,at least 48 hours'prior to conducting grouting , <br /> procedures A traffic rated well boxhwill be installed over the monitoring well. <br /> f{ <br /> Following completion of the monitoring wells,-well,elevations and locations will be surveyed by a <br /> l - Califdmia-licensed surveyor. t <br /> t. &: <br /> 4.5. EQUIPMENT DECONTAMINATION <br /> a t All sampling tools used for sample collection-will be thoroughly washed with a solution of Alconox <br /> and water and rinsed with:cleari water prior to use. All down-hole drilling and sampling equipment y <br /> will be pressure washed prior to.starting each boring. <br /> f1J, 41 <br /> ' y <br /> , <br /> tt <br /> r _ r <br /> .w 41 <br /> If <br /> h i 'rI I <br /> I:I <br /> Advanced GeoEnv,ronmental Inc. - <br /> - a <br />
The URL can be used to link to this page
Your browser does not support the video tag.