Laserfiche WebLink
Hazardous Waste Contingency Plan <br />Holz Rubber Cotnoanv <br />TABLE OF CONTENTS <br />1. <br />Introduction. . 0 a W a a 6 0 a a 0 a a a a 0 4 a 0 a a a a a a 0 & a 0 0 0 0 9 9 0 0 a 0 a 9 a 0 1 0 0 & 0 0 4 0 0 0 W 6 a 6 0 a 6 a 6 a 0 0 0 0 0 14 a 9 0 0 0 0 0 0 0 a 0 a a a a b a 9 * 6 a 0 0 a a 0 a a a I I a W 4 a a a a a a 0 a 0 0 a 0 a 0 0 a <br />1.1 Purpose and Implementation of Contingency Plan — 40 CFR 262.260, 22 CCR 66264.51.0.1 <br />1.2 Contents of Contingency Plan — 40 CFR 262.261, 22 CCR 66264.52 ......................................1 <br />1.3 Relation with Other Plans — 40 CFR 262.261 (c).........................................................................2 <br />1.4 Quick Reference Guide — 40 CFR 262.262 (b), 22 CCR 66262262 (b) (proposed)...............2 <br />1.5 Amounts and Hazards of Waste Accumulated On-site..............................................................2 <br />2. Emergency Coordinator and Procedures...........................................................................3 <br />262.264 22 CCR 66264.55 ................................................3 <br />2.1 Emergency Coordinator — 40 CFR <br />2.2 Emergency Procedures — 40 CFR 262 265, 22 CCR 66264.56 ..................................................4 <br />2.2.1 Notification — 40 CFR 2162.265(a), 22 CCR 66264.56(a)...........................................:........4 <br />2.22 Identification of Hazards — 40 CFR 262.265(6), 22 CCR 66264.56(b) .............................5 <br />2.2.3 Assessment of Hazards — 40 CFR 262.265(c), 22 CCR 66264.56(c), . 0 1 0 5 <br />22.4 Re ortin 40 CFR 262.265 d , 22 CCR 6626=4.56 d 5 <br />Reporting ()()....................................................... <br />2.2.5 Other Response Actions — 40 CFR 262.265 (e), (� 22 CCR 66264.56(e) .......................6 <br />2.2.6 Follow-up Procedures, 22 CCR 66264.56(9)........................................................................6 <br />2.2.6.1 Recovery and Disposal — 40 CFR 262.265 (g),(h)...........................................................6 <br />2.2.6.2 Follow lip Notification and Reporting— 40 CFR 262.265 (i), 22 CCR 66264.56(j).6 <br />3. Additional Plan Contents...................................................................................................6 <br />3.1 Emergency Coordination Agreements — 40 CPR 262.256(6), 22 CCR 66264.52(c) ...............7 <br />3.2 Emergency Coordinators Contact Information — 40 CFR 262.261(d), 22 CCR 66264.52(d)8 <br />3.3 Emergency Equipment — 40 CFR 262.261(e), 22 CCR 66264.52(e) .........................................8 <br />3.4 Evacuation Plans - 40 CFR 262261(1), 22 CCR 66264.52(f) .....................................................8 <br />3.5 Inspections.........................................................................................................................................8 <br />4. Copies of Contingency Plan and Quick Reference Guide - 40 CFR 262.262, 22 CCR <br />66264.52...................................................................................................................................... 9 <br />5. Amendment of Contingency Plan — 40 CFR 262.263, 22 CCR 66264.540 a 9 a 6 a d a 6 0 a a 0 a 480606006*60M09 <br />Figures <br />Figure 1 Site Plan <br />Figure 2 Site Topography Map <br />Appendices <br />A. Quick Reference Guide <br />B. Emergency Notification Phone List (Etiternal) <br />C. Emergency Equipment List <br />D. Emergency Action Plan <br />E. Spill Notification Form <br />F. Hazardous Waste Storage Area Inspection Forms <br />G. Plan Distribution List <br />t <br />