Laserfiche WebLink
k4 KLEINFELDER <br /> 2 SCOPE OF WORK <br /> l <br /> Three soil borings will be drilled and , converted to 2-inch-diameter ground water <br /> monitoring wells. The locations of the ground water monitoring wells are` shown on Plate <br /> 2, Boring Location Map. After installation, the monitoring wells will be developed and <br /> sampled. Three ground water samples plus one duplicate sample will b'e analyzed by a <br /> State certified Iaboratory. Specific analyses are described in Section 3 of this work plan. <br /> Detailed procedures describing soil borings; qualitative field screening; ground water <br /> monitoring well installation, development, and sampling; surveying; and the disposition of <br /> soil and water generated during the field activities"are available for review as Appendix A, <br /> Kleinfelder Field Procedures. <br /> kr <br /> j. <br /> j <br /> 163-89-161 2 <br />