My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
1950
>
2200 - Hazardous Waste Program
>
PR0514320
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 12:24:26 PM
Creation date
6/5/2020 2:13:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0514320
PE
2228
FACILITY_ID
FA0006136
FACILITY_NAME
PREMIUM TRUCK AND TRAILER REPAIR INC
STREET_NUMBER
1950
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15308006
CURRENT_STATUS
01
SITE_LOCATION
1950 E MINER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERS Consolidated Emergency Response 1 Contingency Plan <br /> INFERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL,OCCUR BY(Check all that apply): CIL <br /> 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; <br /> ❑ El 3.TELEPHONE; <br /> 4.PAGERS; <br /> ❑5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> NQTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): C12. <br /> I.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: C13 <br /> PRIMARY EMERGENCY COORDINATORNAME:m�/f ' PHONE &yS(DrPHONENO.: <br /> ALTERNATE EMERGENCY COORDINATOR NAME:&ILC Ped0 LPHONE NO.-.M 6Y7 ggjv PHONE NO.: <br /> ❑Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more than one alternate emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases,fires and/or explosions. <br /> ® I. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC.; <br /> ❑2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> ❑3. PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,spill pigs,spill pillows); <br /> ❑4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> [__15. LINED TRENCH DRAINS AND/OR SUMPS; <br /> ❑6. AUTOMATIC FIRE SUPPRESSION SYSTEM, <br /> 107. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> 198. STOP PROCESSES AND/OR OPERATIONS; <br /> ❑9. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> ❑ 10.SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> 11.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> Zj 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> ❑ 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> ® 15.REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> 16.HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> 17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑ 18.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> 19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> ®20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑21.OTHER(Specify): D2. <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNALS)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check a]I that apply): Er. <br /> ❑ 1. BELLS; E2. <br /> ❑2. HORNS/SIRENS; <br /> E3, VERBAL Ox.,Shouting); <br /> E14. OTHER(Specify), <br /> S eci ): <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g. Parking lot,street comer): E3. <br /> �i��f SLI(�' I'V1a l 1'1 e��'Yl�,f`ZCf'-- -�L�-�' <br /> Note:The E er enc Coor ator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: <br /> WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> 12 3. OTHER(Specify): as. <br /> Note:Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): F1. <br /> 1. HAVE BEEN DETERMINED NOT NECESSARY; <br /> ❑2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): }" <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made for your facility,if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev.03/07/17 Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.