My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2231-2238 – Tiered Permitting Program
>
PR0506982
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 11:16:58 AM
Creation date
6/5/2020 2:18:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0506982
PE
2231
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Smith Engineering, Inc. <br />P.O. Box 611, Lodi, CA 95241 <br />(209) 334-2332 <br />Estimated Closure Costs 11-13-2020 <br />Facility — Wastewater Pretreatment System covered by permit (conditionally authorized — CA) <br />Treatment Provided: <br />1. Oil Removal — API Separator <br />2. Neutralization — mix tanks, mixers, pH probes, chemical metering pumps. <br />3. General — wastewater storage tanks, pumps, piping <br />Closure Procedure <br />Normal operation of the system results in empty tanks at the end of each <br />processing day (i.e. wastes are not accumulated, they are processed daily and <br />hence removed from the system. Thus, closure can be achieved simply by <br />cleaning the tanks, piping and pumps, and since they are all useful process <br />items, leaving the equipment in place. The tanks are all cross linked <br />polyethylene, the piping is PVC and the pumps are plastic or metallic. <br />None of the equipment will absorb any contaminants from the wastewater. <br />Careful rinsing and cleaning will result in fully decontaminated equipment, <br />suitable for use in a number of other processing applications. Therefore, <br />proceed as follows: <br />1. Process all wastewater through the system to the sewer if not already <br />Done. Time allowed — 1 -man day = 8 -man hours <br />2. Empty the caustic and acid storage tanks to trailers and transfer to uses <br />Elsewhere. Triple rinse the tanks, neutralize the rinse water. Estimated time <br />Required — 2 -man days = 16 -man hours <br />3. Rinse the API Separator with hot water and collect all floating oil in the <br />tank provided. Estimated time required — 1 -man day = 8 -man hours <br />4. Process all wastewater through the neutralizers, rinse the tanks and <br />neutralize the rinsate. Discharge to the sewer. Estimated time required — 3 <br />man days = 24 -man hours <br />Total man hours required = 8+16+8+24 = 56 -man hours. <br />Cost at $80/man hours = $4,480.00. <br />Miscellaneous costs for cleaners, equipment, etc. _ $2,600.00 <br />Allowance for disposal of pipe, fittings, equipment, if necessary = $2,200.00 I <br />No. <br />Total closure costs = $9,280.00 * 1-22 <br />�F &I <br />
The URL can be used to link to this page
Your browser does not support the video tag.