Laserfiche WebLink
BROWN AND CALDWELL <br /> NOTICE OF UNSAFE CONDITIONS <br /> 5 <br /> Contractor: Date: <br /> L Project: Job No.: <br /> i <br /> This notice is to advise you, the prime Contractor on the above Contract, that an unsafe <br /> condition has been observed (on the date shown above) on your Project by this <br /> representative of the Owner of the above mentioned project. These conditions are listed <br /> as follows: <br /> ITEM CONDITION M <br /> f <br /> i <br /> I� <br /> By this Notice, the Owner or its Representatives, shall not assume any responsibility under <br /> the GENERAL CONDI'T'IONS or assume any liability for the existence or correction thereof, <br /> for the unsafe conditions, or any others that may have been unnoticed. <br /> These conditions shall be remedied as soon as possible within a safe working period. If <br /> these corrections are not made, the Owner will be forced to remove all field staff from the <br /> job. No payment shall be made for any work installed after this date without first <br /> examination of work in accordance with the GENERAL CONDITIONS. <br /> Representative of the Owner: <br /> r <br /> Title: Date: <br /> Received.by: <br /> Title: Date: <br /> Figure 9. Notice of Unsafe Conditions <br />