My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012637
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0012637
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 2:39:03 PM
Creation date
6/5/2020 2:26:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012637
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r�. <br /> SCoill E <br /> '1'lte scope of this investigation wiil inciude coordinating access approval for installation of <br /> the wells, ins[allation of five groundwater[nanitoring w'elis and one ztraunciwater extraction well. <br /> coordinLtion of soil and groundwater disposal, and a complete horizontal and vertical survey of <br /> :€ll existil,g on-site. weils and proposed off-si[e wells relative to a known local benchmark <br /> elevation performed by a registered professional surveyor. - <br /> Hvdtocarbons have been identified in the groundwater in all of the existing monitoring wells <br /> on the site. Table 1 presents pertinent information on each of the proposed wells/borelioles. <br /> %yells ATR-3 through ATR-12 have been proposed in order to more completely define rite snit <br /> and groundwater contamination before remediation takes place, as required by the County. <br /> Boreholes BH-1 and 13H-2 have been proposed to identify the soil conditions near the <br /> underground storage tanks (USTs). <br /> one extraction well will be drilled by 8-inch hollow-stem augers and will be continuously <br /> cored from the surface to a depth of 20 feet below the water table or pfezometric surface. The <br /> borehole will be reamed out to total depth using 12-inch augers and will then be completed as <br /> a monitoring well by the method described below. The extraction well will be located near <br /> ATR-3 as indicated on Figure 1. Groundwater occurs at approximately 1 I feet below the ground <br /> surface at this site and the extraction well is expected to be approximately 40 fee: deep. <br /> The immediate purpose of the groundwater extraction well is to provide a means of <br /> conducting an aquifer test to determine aquifer characterisdcs (relevant to the final groundwater <br /> remediation system design). The extraction well will be used in the final remediation system <br /> design. The question of the discharge of the treated groundwater from Lhe extraction well has <br /> not yet been addressed- <br /> A schemadc of the extraction well construction is shown on Fgure 4. The well screen will <br /> be selected based upon a grain size analysis performed by Brown and Caldwell on samples <br /> collect:d from the saturated zone of either TEX-I or BH-2. The proposed well design is <br /> intended to accommodate water-level iluctuadons and drawdown during extraction within the <br /> slotted interval. The p.oposed well' design may be modified in the field during the drilling <br /> operation,depending upon conditions encountered during drilling. In no case will i,he monitoring <br /> well penetrate r?ay zones greater than feet thick (based on field observations of continuous <br /> core), which might allow downward migration of contaminants into lower water-bearing one <br /> Blank 6-inch-diameter Schedule 40 PVC casing will extend from the top of the perforated section <br /> to the ground surface. �t perforated m will be ttac e�' to the bottter <br /> om of the s reen. A bot o p g <br /> Schedule 40 PVC. A 5_ P <br /> will be-fitted onto the bottom of.this.sump.-._...._ _. <br /> The annular space surrounding the well screen and casing will be packed with a filter pack <br /> ed from the batted <br /> designed to be compatible with the natural formation. The filter will be plac <br /> of the sump to approximately 2 feet above the top of the screen. The well will theta be bailed <br />
The URL can be used to link to this page
Your browser does not support the video tag.