My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012637
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0012637
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 2:39:03 PM
Creation date
6/5/2020 2:26:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012637
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
try. <br /> :\-2 <br /> ]MIZE110111.1 DRILLUNG <br /> Borunoics are drilled bV;i JLi!nsco drilling subcontractor. usiffig a truck-mounted drilling ria <br /> equipped with nonurial I)-iF1Cit-djd1nC%Cr hallow-stern IULer-,. Boreholes are drilled by continuous <br /> coring to a predu(ennincd depth below the ground surface. or to goundwawr, xhichevcr is <br /> encountered first. Borehole depths are based on site conditions, including but not limited to <br /> conditions such as depth to waler, topography, and&pth to bedrock. Borehole depths also may <br /> be governed by obtaining two readings on a pid, or equivalent instrument, which are less than <br /> 50 parts per million above the background reading, in which case the borehole is terminated:: <br /> At the end of the drilling and sampling operations, boreholes are immediately backfilled <br /> from bottom to top with a bentonite/cement slurry pumped through a tremie pipe. <br /> To prevent cross contamination during drilling, all equipment is steam cleaned prior to and <br /> between use at each borehole. <br /> G ROUN DWATER MONITORING AND EXTRACTION WELLS <br /> Monitoring Well Drilling. Groundwater monitoring wells are drilled by the method <br /> described in the section entitled Borehole Drilling, with the exception that they are drilled to a <br /> depth of 15 or 20 feet below Lh-. water table or piezometric surface, depending upon known <br /> conditions and upon unanticipated conditions encountered during drilling. The borehole is then <br /> compl,-red as a monitoring well by the method described below. <br /> Monitoring Well Completion. Groundwater monitoring wells are completed with polyvinyl <br /> chloride casing (PVC) screen and casing. The off-site wells will be completed using 2-inch- <br /> diameter PVC. A PVC cap is installed at the bottom of each well. The extractiodwell will be <br /> completed with 6-inch-diameter Schedule 40 PVC casing. <br /> The well screen typically is 0.020-inch slotted flush-threaded PVC,extending from a depth <br /> of approximately 15 or 20 feet below the water table or piezometric sw-face to 5 to 10 feet above. <br /> The well design is intended to accommodate seasonal water-level fluctuations within the slotted <br /> interval. -The well design may be modified in the field during the drilling operation,depending <br /> upon conditions encountered during drilling. In no case does the monitoring well penetrate clay <br /> zones greater than 5 feet thick, which might allow downward migration of contaminants into <br /> lower water-bearing zones. Blank casing extends from the top of the perforated section to the <br /> ground surf-ace (or above, in the case of above-ground completion). <br /> The annular space surrounding the well screen and casing is packed with sand that is <br /> compatible with the well screen,from the bottom of the screen-to appmximately 2 feet above the <br /> top of the screen. The well is then bailed or surged to settle the filter pack, and more sand is <br /> added as necessary to return the level to a height of 2 feet above the top of the screen. A 2- to <br />
The URL can be used to link to this page
Your browser does not support the video tag.