Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): CH . <br /> 1 . VERBAL WARNINGS ; 1712 . PUBLIC ADDRESS OR INTERCOM SYSTEM ; FEI 3 . TELEPHONE; <br /> ❑ 4 . PAGERS ; ❑ 5 . ALARM SYSTEM; ❑ 6 . PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF- SITE RELEASE WILL OCCUR BY (Check all that apply) : C12. <br /> ❑n 1 . VERBAL WARNINGS ; ❑ 2 . PUBLIC ADDRESS OR INTERCOM SYSTEM; Q 3 . TELEPHONE; <br /> ❑ 4 . PAGERS ; ❑ 5 . ALARM SYSTEM; ❑ 6 . PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: cts . <br /> PRIMARY EMERGENCY COORDINATOR NAME: Michael Ludwick PHONE NO . : (650 ) 272-8033 PHONE NO. : <br /> ALTERNATE EMERGENCY COORDINATOR NAME: Kent Smedley PHONE NO . : (925) 724 -8422 PHONE NO. : <br /> ❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO . : <br /> Note : If more than one alternate emergency coordinator is designated, attach a list in order of responsibility . <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check thea plicable boxes to indicate your facility 's procedures for containing spills and preventin and miti atin releases, fires and/or explosions . <br /> M . <br /> Q 1 , MONITOR FOR LEAKS , RUPTURES , PRESSURE BUILD-UP, ETC . ; <br /> ❑ 2 . PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g. , Portable spill containment walls, built-in berms); <br /> 93 , PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g. , Pads, spill pigs, spill pillows); <br /> 0 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS ; <br /> ❑ 5 . LINED TRENCH DRAINS AND/OR SUMPS ; <br /> ❑ 6 . AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> Rl 7 . ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS ; <br /> 8 . STOP PROCESSES AND/OR OPERATIONS ; <br /> ❑ 9 . AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> ❑ 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES ; <br /> ❑ 11 . CALL 9- 1 - 1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> ❑ 12 . NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS ; <br /> ❑ 13 . ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION ; <br /> ❑ 14 . PROVIDE PROTECTIVE EQUIPMENT FOR ON- SITE EMERGENCY RESPONSE TEAM; <br /> 0 15 . REMOVE CONTAINERS AND/OR ISOLATE AREAS ; <br /> ❑ 16 . HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> I Q 17, USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> FmI 18 . VACUUM SUCTION USING APPROPRIATE VACUUM (e .g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br /> 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> on 20 . PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS ; Dz <br /> ❑ 21 . OTHER (Specify) : <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): Et . <br /> E2. <br /> ❑ 1 . BELLS ; <br /> ❑ 2 . HORNS/SIRENS ; <br /> 3 . VERBAL (i. e., Shouting); <br /> ❑ 4 . OTHER (Specify) : <br /> THE FOLLOWING LOCATIONS ) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S ) (e.g. , Parking lot, street corner) : Es . <br /> Note: The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS : F4' <br /> ❑ 1 . WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS ; <br /> R1 2 . EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS ; <br /> Es. <br /> El 3 . OTHER (Specify): <br /> Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan . <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following) : F1 <br /> rmC 1 . HAVE BEEN DETERMINED NOT NECESSARY; Ez <br /> ❑ 2 . THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify) : <br /> Note : Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br /> contractors should be made for your facility, if necessary . Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev. 03/07/17 Page 2 of 4 <br />