My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 9:38:38 AM
Creation date
6/8/2020 9:28:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A R N Environmental Health Department <br /> i , �V <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> SUSD-CORPORATE YARD 1932 EL PINAL DR, STOCKTON May 22, 2020 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 313 HSC 25290.1,25290.2, 25291 Failure to construct, operate, and maintain primary containment as product-tight. <br /> OBSERVATION: Liquid was observed in UDC 3/4, indicating a leak in the primary containment. <br /> REGULATION GUIDANCE:All primary containment for the UST system must be product tight. <br /> CORRECTIVE ACTION: Immediately have a properly licensed,trained, and certified contractor repair or replace the <br /> failed component(s), under permit and inspection of the EHD if necessary. <br /> This is a repeat violation, Class ll. <br /> Overall Inspection Comments: <br /> On site for the monitoring system certification. The testing was not witnessed in its entirety. Looked inside all <br /> sumps and UDCs. Verified proper sensor locations. Paperwork inspection is still needed. A checklist was left <br /> on site; a complete report will be provided at the time of paperwork inspection. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the complete inspection report. <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead <br /> of having them sign. Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate <br /> ($152). To schedule an appointment, please call (209)468-3420. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br /> THIS FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: May 22, 2020 Inspector: Inspector Phone: <br /> Printed Name and Title: SHEWIT WOLDEAREGAY, EH Specialist (209)468-0216 <br /> Jose Hernandez, Environmental Compliance Technician <br /> FA0004016 PR0231097 SCO01 05/22/2020 <br /> EHD 23-01 Rev.9/20/2019 Page 4 of 4 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.