My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007560
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0007560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:33:55 AM
Creation date
6/8/2020 9:52:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007560
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date, October 29,2003 <br /> Quarter 3'd Quarter,2003 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 02093 <br /> Address 3425 Tracy Blvd , Trac , California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466259 OL058 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Department <br /> SJCEHD <br /> Assembly Bill 681 Status Property owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (Third 2003).- <br /> 1 <br /> 003):1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Performed operation and maintenance on AS systems <br /> 4 Submitted Vertical Flow Assessment Report September 2,2003 <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth 2003): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> • 2 Prepare and submit quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY (Third 2003): <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling ATR-2, ATR-4, ATR-5, ATR-7, ATR-8, and ATR-12 <br /> sampled quarterly, ATR-1, ATR-3, ATR-6, ATR-9, ATR-10, <br /> and ATR-11 sampled 1 st and 3'dquarters only <br /> Frequency of Groundwater Monitoring Quarter) <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered this Quarter None <br /> Cumulative FP Recovered to Date <1 gallon <br /> Current Remediation Techniques Air 5 ar in SVE system current) off <br /> TPHG removed by SVE this Quarter None <br /> Cumulative TPHG Removed 3,616 6 lbs <br /> Approximate Depth to Groundwater 8 92 to13 15 ft <br /> Groundwater Flow and Gradient Northeast at 0 0015 ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results, and surrogate recoveries),the data are acceptable as reported by the laboratory <br /> with the following limitations <br /> • The reported result for total petroleum hydrocarbons as gasoline (TPHg) in sample ATR-5 is due to a discrete <br /> peak at C-5 (probably MtBE)and has been refected - <br /> K lwpmo ssVS BP ARC01020931Quarte0f\3 QTR 6312093 GWMR 3Q03 da <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.