My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007561
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0007561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:35:28 AM
Creation date
6/8/2020 9:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007561
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
um <br /> • <br /> Mr Harlin Knoll Page 2 <br /> San Joaquin County Environmental Health Department <br /> April 24, 2003 <br /> extraction well (TEX-1) have been installed at the site Currently,the site is on a quarterly groundwater <br /> monitoring schedule Soil vapor extraction and air sparging is ongoing at the site <br /> SCOPE OF WORK <br /> URS proposes to conduct vertical groundwater flow and well condition assessment on wells ATR-2, <br /> TEX-1, ATR-7, and ATR-8 Welenco, Inc , of Bakersfield, California will be subcontracted to perform <br /> a depth-discrete vertical flow analysis for wells ATR-2 and TEX-1 with a F1oVisionTM flowmeter probe <br /> The F1oVisionTm apparatus indicates both the direction and the velocity of groundwater movement <br /> within the well The analysis will be performed at approximately 2-foot depth intervals along the <br /> submerged portion of the screen intervals listed in Table 1 Approximately thirteen flow measurements <br /> will be recorded for well TEX-1 and approximately ten measurements will be recorded for well ATR-2 <br /> Data from the FloVisionTm apparatus will be used to create profiles showing the direction (up or down) <br /> and flux of groundwater flow along the well screen as shown in Appendix A This information will be <br /> used to determine if wells ATR-2 and TEX-1 are acting as vertical conduits for shallow contamination <br /> to impact deeper water-bearing zones Video images taken during the investigation will also be used by <br /> URS to assess the condition of the wells (weeping perched layers, breaks in the casing, debris on the <br /> well bottom, biological growth, etc ) Details of the MoVisionTm apparatus are included in <br /> Attachment A <br /> Additionally, a separate down-hole camera unit will be used to assess the condition of wells ATR-7 and <br /> ATR-8 (weeping perched layers, breaks in the casing, debris on the well bottom, biological growth, <br /> etc ) <br /> SCHEDULE <br /> Upon approval of this workplan, URS will schedule field activities A report documenting the results of <br /> the vertical flow assessment and well condition assessment will be submitted approximately 6 to 8 <br /> weeks after completion of the fieldwork <br /> K V5 BP ARCON02093Wertical Flow Study12093 Vgradient WorKplan doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.