My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007562
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0007562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:42:15 AM
Creation date
6/8/2020 9:53:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007562
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yl <br /> Date July 29,2003 <br /> Quarter. 2nd Quarter,2003 <br /> • ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 02093 <br /> Address 3425 Tracy Blvd , Tracy, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466080 00336 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Department <br /> (SJCEHD) <br /> Assembly Bill 681 Status Property owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (Second 2003): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and subnutted quarterly groundwater monitoring report <br /> 3 Performed operation and maintenance on AS system's <br /> 4 Subnutted work plan for vertical flow assessment <br /> WORK PROPOSED FOR NEXT QUARTER (Third 2003): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> . 2 Prepare and submit quarterly groundwater monitoring report <br /> 3 Implement work plan for vertical flow assessment <br /> QUARTERLY RESULTS SUMMARY (Second 2003): <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling ATR-2, ATR-4, ATR-5, ATR-7,ATR-8, and ATR-12 <br /> sampled quarterly, ATR-1,ATR-3, ATR-6, ATR-9, ATR-10, <br /> and ATR-11 sampled 1 s`and Td quarters only <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered this Quarter None <br /> Cumulative FP Recovered to Date _ <1 gallon <br /> Current Remediation Techniques _ Air Surging (SVE system currently off) <br /> TPHG removed by SVE this Quarter None <br /> Cumulative TPHG Removed 3,616 6 lbs <br /> Approximate Depth to Groundwater 8 81 toll 52 ft <br /> Groundwater Flow and Gradient Variable at 0 02 fVft <br /> ANALYTICAL DATA REVIEW- <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions, holding times, <br /> LCS/LCSD results, MS/MSD results, and surrogate recoveries), the data are acceptable as reported by the <br /> laboratory <br /> • <br /> K MPmcess\15 BP ARC0+020931Quxnerlyl2 QTR 0312093 GWMR 2Q03 do. Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.