My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007563
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0007563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:27:53 AM
Creation date
6/8/2020 9:53:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007563
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date May 19,2003 <br /> Quarter: F" Quarter,2003 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 02093 <br /> Address 3425 Tracy Blvd , Tracy, California _ <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466080 00336 <br /> Primary Agency/Regulatory ID No San Joaquin Count SJC <br /> Assembly Bill 681 Status Property owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (First 2003): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and subnutted quarterly groundwater monitoring report <br /> 3 Restarted and performed operation and maintenance on AS systems <br /> WORK PROPOSED FOR NEXT QUARTER (Second 2003): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> . QUARTERLY RESULTS SUMMARY (First 2003): <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling ATR-2, ATR-4, ATR-5,ATR-7, ATR-8, and ATR-12 <br /> sampled quarterly, ATR-1, ATR-3, ATR-6, ATR-9, ATR-10, <br /> and ATR-11 sampled 1 s'and 3`d quarters only <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered this Quarter None <br /> Cumulative FP Recovered to Date <i gallon <br /> Current Remediation Techniques Air Sparging (SVE system currently off) <br /> TPHG removed by SVE this Quarter None <br /> Cumulative TPHG Removed 3,616 6 lbs <br /> Approximate Depth to Groundwater 8 75 to12 92 ft <br /> Groundwater Flow and Gradient Northeast @ 0 003 to 0 004 ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions, holding times, <br /> LCS/LCSD results, MS/MSD results, and surrogate recoveries), the data are acceptable as reported by the <br /> laboratory <br /> K 1WprocessVS 9P ARC(MD93�QuanerlyV QTR 03 2093 GWMR IQ03 do Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.