Laserfiche WebLink
' Mr Kyle Christie <br /> January 11, 1995 <br /> Page 3 <br /> • Installed seven dual completion soil vapor extraction/air sparge wells, one dual <br /> completion groundwater monitonng/air sparge well, and two air sparge wells <br /> Work Anticipated During Fourth Quarter 1994 <br /> • Sample groundwater monitonng wells for fourth quarter of 1994 Sampling to be <br /> performed by GTI <br /> • Prepare third quarter 1994 groundwater monitoring report <br /> • Prepare and submit summary report on remediation well installation <br /> • Collect and analyze samples of the free and dissolved product in wells ATR-3, <br /> ATR-8, and SMW-l �' t <br /> It you have any questions regarding this quarterly report, please contact me at (916) 444-0123 <br /> Sincerely, <br /> r <br /> e BROWN AND CALDWELL 1 <br /> 4 <br /> Steve Misner Pat Cullen <br /> Project Manager California Registered Geologist#4932 <br /> SDM PGC ksc <br /> Enclosures <br /> cc Mr Harlin Knoll, San Joaquin County Local Health District <br /> Ms Elizabeth Thayer, California Regional Water Quality Control Board <br /> Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 1261\REFORTM3RD94QTR RPT <br />