My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0007989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:23:24 AM
Creation date
6/8/2020 10:06:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007989
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> Mr Chuck Carmel <br /> August 15, 1994 <br /> Page 3 <br /> (0 5 pg/1) and xylenes (0 6 µg/1) Additionally, a different analytical laboratory analyzed the <br /> samples this quarter, and they used a lower detection limit (0 3 µg/1) for benzene, toluene, and <br /> ethylbenzene than the previous laboratory (0 5 pg/l) Therefore, the low concentrations of <br /> BTEX identified in the ATR-1, 2, and 9 through 12 samples are attributed to sample handling <br /> (based on the presence of toluene and xylenes in the trip blank) and/or to the lower detection <br /> limits <br /> BTEX and TPH-G were not identified in the ATR-7 sample Well ATR-3 had not been <br /> sampled since the fourth quarter of 1991 due to the presence of free product in the well, <br /> however, this quarter no free product was present, and a sample was collected in which <br /> moderate concentrations of BTEX (27 pg/l to 200 µg/1) and TPH-G (1,900 pg/1) were <br /> identified Well ATR-8 contained 0 14 feet of free product and was not sampled <br /> ARCO is preparing a work plan for the installation of air sparge and soil vapor extraction <br /> wells at this site The work plan will be submitted to the County and Regional Board by <br /> July 20, 1994 Upon approval of the work plan by the County, drilling permits will be <br /> secured and drilling will be scheduled These wells will become part of the remediation <br /> system currently being designed for the site The remediation system will be installed autumn <br /> of 1994 <br /> SUMMARY OF WORK <br /> Work completed in First Quarter 1994 <br /> • Prepared and submitted fourth quarter 1993 groundwater monitoring report <br /> • Sampled groundwater wells for first quarter 1994 Sampling performed by GTI <br /> Work Anticipated During Second Quarter 1994 <br /> • Sample groundwater monitoring wells for second quarter 1994 Sampling to be <br /> performed by GTI <br /> If you have any questions regarding this quarterly report, please contact me at (916) 444-0123 <br /> Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 12641REP0RTSX1ST94Q"IR RPT <br />
The URL can be used to link to this page
Your browser does not support the video tag.