Laserfiche WebLink
• Ground rater Sam,)lin9 Protocol <br /> T h:s attachment documents the procedures followed by Groundwater Technology Inc during the <br /> groundwater monitoring and samoling program for Arco Products Companv As requested by Arco, this <br /> attachment wul be incfudec wttn the first set of data delivered to the lead consultant <br /> Included in this attachment are <br /> t) Groundwater Technology Inc Standard Operating Procedure No 8 Groundwater Monitoring <br /> 2) Groundwater Technology, Inc Standard Operating Procedure No 9, Water Sampling <br /> Methodology <br /> 3) Groundwater Technology, Inc Standard Operating Procedure-No 10 Sampling for Volatiles In <br /> Water (Dissolved Gasoline Solvents, Etc) <br /> 4) Groundwater Technology, Inc Standard Operating Procedure No 11, Chain-of-Custody <br /> Protocol <br />. <br /> The data delivered to the lead consultant each quarter will include <br /> 1) Arco Products Company Chan-of-Custody <br /> 2) Field Report (depth to water/floating product survey) <br /> 3) Groundwater Sample Field Data Sheet <br /> 4) Laboratory Deports <br /> 5) Summary of Groundwater Monitoring Data <br />