Laserfiche WebLink
Mr Chuck Carmel <br /> September 6, 1994 <br />. page 3 <br /> SUMMARY OF WORK <br /> Work Completed in Second Quarter 1994 <br /> • Sampled site groundwater monitoring wells for the second quarter 1994 <br /> Sampling performed by GTI <br /> • Prepared and submitted first quarter 1994 groundwater monitoring report <br /> Work Anticipated Daring Third Quarter 1994 <br /> • Sample groundwater monitoring wells for third quarter of 1994 Sampling to <br /> be performed by GTI <br /> • Prepare third quarter 1994 groundwater monitoring report <br /> Install remediation system wells <br />• Install remediation system autumn 1994 <br /> If you have any questions regarding this quarterly report, please contact me at(916) 444-0123 <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> 1� VaCt� <br /> teve Misner G Cullen <br /> Project Manager California Registered Geologist#4932 <br /> SDM PGC kc <br /> Enclosures <br /> cc Mr Harlin Knoll, San Joaquin County Local Health District <br /> Ms Elizabeth Thayer, California Regional Water Quality Control Board <br /> Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 12641REPORTS12NB44QTR RPT <br />