Laserfiche WebLink
4i <br /> SOIL VAPOR EXTRACTION SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date 'flit )Is Time of Arrival 1 2--0 <br /> Technician 6) l C 1t E Time of Departure <br /> Site Engineer_ Rusty E_Benkosky Was Site Engineer or substitute contacted from field? <br /> Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location 3425 Tracy 81vd, Tracy.CA Station No ARCO#2093 Project No 7G600-026-01 Task 109 <br /> Abatement Equip nn Serial No <br /> K <br /> SVE Blower Max AMP Rating <br /> SPG Blower MAX AMP Rating <br /> Telemetry N QA 9— 7 L <br /> _ ��es Elect Meter Reading t r OJ Z <br /> Electrical Power __ <br /> Supp Fuel Meter Reading <br /> Supplemental Fuel <br /> No of K/0 barrels at site _Full Empty <br /> PARTS SVE SYSTEM DATA <br /> System up or down upon arrival Ofr (If down please complete PART E) <br /> Hourmeter Reading At time <br /> F) <br /> Flow to Before Adjustment Final Ideal Range <br /> %Dilution valve open <br /> %Recirculation Ive open <br /> IVO Content al <br /> Vacuum @ blower(in H <br /> Gauge Range <br /> AMPS drawn by blower motor A S <br /> Total System Flow(a P in H2O) <br /> Pi Size " <br /> Well Field Air Flow(A P in H20) <br /> Pipe Size# 4" <br /> Dilution Air Flow(A P "H2O) <br /> Pipe Size <br /> u) <br /> FID Data WCIINOCIDF WCMlOCIDF Ideal Flan e <br /> System Influent my before dilution <br /> System influent my after dilution <br /> System Effluent my <br /> Field instrument Used Last Calibrated <br />