My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0008018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:22:32 AM
Creation date
6/8/2020 10:16:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008018
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO PRODUCTS COMPANY <br /> SOIL VAPOR EXTRACTION AND TREATMENT SYSTEM OPERATING REPORT <br /> SECOND QUARTER,1997,FACILITY 2093 <br /> • Facility# 2093 <br /> Facility address 3425 Tracy Blvd Tracy,CA <br /> ARCO engineer Mr Paul Supple <br /> Consultant[project manager] Brown and Caldwell [Steve Misner,(916)444-0123] <br /> Lead agency CRWQCB,Central Valley Region, San Joaquin Co <br /> Public Health District <br /> Reporting period 3/31/97-6/30/97 <br /> Equipment inventory King-Buck Hasstech I00 cfm catalytic oxider(MMC5-A) <br /> 5 hp,240V,3-phase ROTRON blower <br /> Knockout pot <br /> Conde dual-stage#6 sparge blower <br /> Sparge well and blower controller/timer(7-channel) <br /> AQMD permit no N-34I3-1-0 <br /> Status for reporting period <br /> A King-Buck 100 cfm catalytic oxidizer was installed on the soil vapor extraction and treatment system(SVET)in <br /> November, 1995,and began operation in January of 1996 The influent soil vapor concentrations decreased <br /> significantly during the fourth quarter 1996 due to high water levels As a result the SVET system was shutdown <br /> on January 13, 1997,and was not restarted until groundwater levels decreased The SVET was restarted on June <br /> 18, 1997,at an influent concentration of 370 ppm The air sparging(AS)system was also started on June 18, <br /> 1997,but was turned off on June 25, 1997 The AS system was turned off because flow was confirmed in only <br /> one sparge well and the AS system had little effect on the influent concentrations to the SVET <br /> Soil vapor extraction system <br /> Operating hours this period 175 <br /> Percent up time 8% <br /> Operating hours to date 3,562 <br /> Operating mode Catalytic oxidation <br /> TPH-G conc end of period(PID,ppmv) 370 <br /> Flowrate end of period(CFM) 45 <br /> TPH-G destroyed this period(PID, lbs) 45 <br /> Air sparging system (Not operating) <br /> Operating hours to date 175 <br /> Attachments <br /> Table 1 Soil Vapor Extraction and Treatment System Influent Data <br /> Table 2 Soil Vapor Extraction and Treatment System Effluent Data <br /> Table 3 Soil Vapor Extraction Well Data <br /> Table 4 Dissolved Oxygen Concentrations <br /> Chart 1 TPH-G Concentrations Versus Time <br /> Chart 2 Cumulative Hydrocarbons Removed(as TPH-G)Versus Time <br /> Assumptions <br /> I The quantity of h)drocarbons removed teas estimated using the influent TPH concentrations <br /> at the oxtdizer in]eL <br /> 2 Percent up time was calculated by dividing actual operating hours as determined from hour meter <br /> readings by the total hours of the reporting period <br />
The URL can be used to link to this page
Your browser does not support the video tag.