Laserfiche WebLink
iMr Kyle Christie <br /> October 5, 1995 <br /> Page 3 <br /> SUMMARY OF WORK <br /> Work Completed in Third Quarter 1995 <br /> • Sampled site groundwater monitoring wells for the third quarter 1995 Sampling <br /> performed by EMCON <br /> • Submitted second quarter 1995 groundwater monitoring report <br /> • Submitted a work plan for installation of two off-site groundwater monitoring wells (to <br /> the north of well ATR-8) <br /> • Selected SVET/AS system constriction contractor and began construction <br /> • Submitted a work plan for the proper destruction of off-site well ATR-12 <br /> Work Anticipated During Fourth Quarter 1995 <br /> • Sample groundwater monitoring wells for fourth quarter of 1995 <br /> • Submit third quarter 1995 groundwater monitoring report <br /> • Startup S VET/AS system <br /> If you have any questions regarding this quarterly report, please contact me at (916) 4440123 <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> �c <br /> Steve Misner Jay Lucas <br /> Project Manager California Registered Geologist#4301 <br /> PYD ksc <br /> Enclosures <br /> cc Mr Harlin Knoll, San Joaquin County Local Health District <br /> Ms Elizabeth Thayer, California Regional Water Quality Control Board, CVR <br /> Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 2043\RE?ORT513RD95QRT DOC <br />