My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0008026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:31:46 AM
Creation date
6/8/2020 10:21:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008026
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Kyle Christie <br /> July 21, 1995 <br /> Page 3 <br /> iRecommendations <br /> On behalf of ARCO, Brown and Caldwell will place wells ATR-1, ATR-3, ATR-6, and <br /> ATR-9 through ATR-11 on a semi-annual sampling schedule These wells are either <br /> upgradient, crossgradient, have historically contained nondetectable hydrocarbon <br /> concentrations, or are near other wells which can provide sufficient groundwater data These <br /> wells will be sampled in the first and third quarters of each year <br /> SUMMARY OF WORK <br /> Work Completed in Second Quarter 1995 <br /> • Sampled site groundwater monitoring wells for the second quarter 1995 Sampling <br /> performed by EMCON <br /> • Submitted first quarter 1995 groundwater monitoring report <br /> 0 Submitted SUET/AS system design to the City of Tracy (City) for review and <br /> comment The City approved the design with modifications <br /> Work Anticipated During Third Quarter 1995 <br /> I <br /> I <br /> • Sample groundwater monitoring wells for third quarter of 1995 <br /> i <br /> • Submit a work plan for the abandonment of off-site well ATR-12. <br /> • Properly abandon well ATR-12. <br /> • Submit second quarter 1995 groundwater monitoring report. <br /> • Select SVET/AS system construction contractor and begin construction <br /> V • Complete construction of the SUET/AS system and begin operation <br /> Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> I <br /> 2D43\RE RTS\2ND45QTR RPP <br />
The URL can be used to link to this page
Your browser does not support the video tag.