Laserfiche WebLink
ry4 <br /> r <br /> CONTENTS <br /> Page <br /> 10 INTRODUCTION . . . . . 1 <br /> 20 SITE DESCRIPTION . . 1 <br /> 30 GEOLOGY AND HYDROGEOLOGY . . . 2 <br /> 4.0 PREVIOUS INVESTIGATIONS . . . . . 2 <br /> 50 PROPOSED WORK . . . . . . . 3 <br /> 51 Soni Excavation and Tank Removal . . . . 4 <br /> 5.2 Soil Sampling . . . . . . . . . 4 <br /> 53 Water Sampling in the Former Tank Cavity . . 5 <br /> 54 Laboratory Analyses . . . . . . . . . . 5 <br /> 55 Soil Stockpiling and Sampling . . . . 6 <br /> 5.6 Aeration and Disposal of Stockpiled Soil 6 <br /> 5.7 Installation of New USTs and Tank Cavity Wells . . 7 <br /> 58 Installation of Vault Boxes and Remediation Piping . . 7 <br /> 59 Site Health and Safety Plan . . 8 <br /> • <br /> 60 REPORT PREPARATION . . . . . . . 8 <br /> 70 REFERENCES . . . . . . . , . . 9 <br /> FIGURES <br /> 1 Site Location <br /> 2 Site Plan <br /> APPENDICES <br /> Appendix A Site Health and Safety Plan <br /> Doc #A159W01 15 <br />