My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008040
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0008040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:33:50 AM
Creation date
6/8/2020 11:06:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008040
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date July 6 2000 <br /> Quarter IQ2000 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2093 Address 3425 Tracy Boulevard Tracy, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR International Incorporated/ Rusty Benkosky <br /> Consultant Project No 077 41728 007 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health <br /> Assembly Bill 681 Stattits Property Owned by ARCO Products Company <br /> WORK PERFORMED THIS QUARTER (Fn st Quai tel — 2000) <br /> 1 Performed quarterly groundwater monitoring event <br /> 2 Submitted quarterly groundwater monitoring report <br /> 3 Performed operation and maintenance on SVE/AS systems <br /> WORK PROPOSED FOR NEXT QUARTER (Second Quaff tei — 2000): <br /> 1 Prepare and subinit quarterly groundwater monitoring report <br /> 2 Perforin quarterly groundwater monitoring event <br /> 3 Perforin operation and ma litenalice on SVE/AS systems <br /> 4 Continue to pulse SVE/AS system <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monrtonn emediation <br /> Frequency of Groundwater Sampling Wells ATR-2 6TR-4 ATR-5 ATR-7 ATR-8 and ATR-12= <br /> Quarterly Wells ATR-1 ATR-3 ATR-6 ATR-9 ATR-10 and <br /> ATR-I 1 = 1"and 3r4 guatiers <br /> Frequency of Groundwater Monitonng Quarterly <br /> Is Free Product (FP)Present On-Site No <br /> FP Recovered this Quarter None <br /> Cumulative FP Recovered to Date <l gallon <br /> Current Remediation Techniques SUES/AS <br /> TPHg removed by SVES this quarter 14 09 lbs <br /> Cumulative TPHg removed 1,498 3 lbs <br /> Approximate Depth to Groundwater 8 18 to 12 45 <br /> Groundwater Gradient Northeast (@rt 0 003 ft/ft <br /> DISCUSSION. <br /> TPHg was detected in three of twelve wells sainpled this quarter ata nia\iinum concentration of 405 ppb (ATR- <br /> 3) Benzene was reported in two NNells Iles quarter at a maminuin concentration of 2 35 ppb(ATR-3) MtBE was <br /> reported in four wells at concentrations ranging from 3 06 ppb (ATR-5) to 2,160 ppb(ATR-3) Groundwater <br /> elevations across the site increased by an average of 0 53 feet this quarter Consistent Nvith historical data, the <br /> groundwater flow was to the northeast Attachment A contains SVE/AS system operational data <br />
The URL can be used to link to this page
Your browser does not support the video tag.