My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008041
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0008041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:43:24 AM
Creation date
6/8/2020 11:09:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008041
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date December 10, 1999 <br /> Quarter 3Q99 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2093 Address 3425 Tracy Boulevard,Tracy, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR International Incorporated/Rusty Benkosky <br /> Consultant Project No 077 41728 006 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health <br /> Assembly Bill 681 Statuts Property Owned by ARCO Products Company <br /> WORK PERFORMED THIS QUARTER (Third Quarter— 1999): <br /> 1 Performed third quarter groundwater monitoring event <br /> 2 Submitted second quarter 1999 groundwater monitoring report <br /> 3 Performed operation and maintenance on SVE/AS systems <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth Quarter— 1999): <br /> 1 Prepare and submit thud quarter 1999 groundwater monitoring report <br /> • 2 Perform fourth quarter 1999 groundwater monitoring event. <br /> 3 Perform operation and maintenance on SVE/AS systems <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monitonng/Remediatton _ <br /> Frequency of Groundwater Sampling Wells ART-2.ATR-4, ATR-5. ATR-7.ATR-8. and ATR-12 <br /> Quarterly�Wells ATR-1, ATR-3.ATR-6, ATR-9. ATR-10 and <br /> ATR-I 1 = IStand 3rd guarters <br /> Frequency of Groundwater Monitoring QMgerly <br /> Is Free Product(FP)Present On-Site No <br /> FP Recovered this Quarter None <br /> Cumulative FP Recovered to Date <1 gaflon <br /> Current Remediation Techniques SVES/AS <br /> TPH-g removed by SUES this quarter 82 66 lbs <br /> Cumulative TPH-g removed 3,430 0 Ibs <br /> Approximate Depth to Groundwater 9 17 to 13 36 <br /> Groundwater Gradient East-northeast _0 004 - <br /> DISCUSSION: <br /> TPH-g was detected in two of twelve wells sampled this quarter at concentrations of 747 ppb(ATR-8)and 2,800 <br /> ppb(ATR-3) Benzene was detected in two of twelve wells at concentrations of 17 5 ppb(ATR-3)and 27 8 ppb <br /> (ATR-8) MtBE was reported in two wells at concentrations of 52 3 ppb(ATR-3) and 5 12 ppb(ATR-5) <br /> Groundwater elevations across the site decreased by an average of 0 18 feet this quarter with the exception of well <br /> ATR-8 where the groundwater increased by 0 36 feet Consistent with historical data, the groundwater flow was <br /> to the northeast Attachment A contains SVE/AS system operational data <br />
The URL can be used to link to this page
Your browser does not support the video tag.