My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012914
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0012914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:44:09 AM
Creation date
6/8/2020 11:13:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012914
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii <br /> a y � <br /> i <br /> 7 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No.: 2093 <br /> Address: <br /> 3425 Tracy Boulevard,Tracy, California <br /> ARCO Environmental Engineer: Mr. Kyle Christie f <br /> Consulting CoJContact Person: Brown and Caldwell/Joel Coffman [(916)444-0123] <br /> Consultant Project No.: 3315 <br /> Regulatory Agencies/Regulatory ID No.: Central Valley RWQCB, San Joaquin County <br /> Pilot Program Site 1416 f <br /> WORK PERFORMED THIS QUARTER (First - 1996): <br /> 1. Conducted groundwater monitoring/sampling for first quarter�of 1996. Work <br /> conducted by Pacific Environmental Group (PEG). <br /> 2. Submitted groundwater monitoring report for fourth quarter of 1995. <br /> 3. Conducted SVETS system startup. <br /> WORK PROPOSED FOR NEXT QUARTER (Second - 1996): <br /> 1. Submit first quarter 1996 groundwater mog report. <br /> ort. <br /> b P <br /> 2. Conduct groundwater monitoring/sampling for second quarter of 1996. Work to <br /> be performed by PEG. !h <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project: Soil and Groundwater:�Remediation <br /> Frequency of Groundwater Sampling: Wells ATR-2, ATR-4,::ATR-5, ATR-7, <br /> ATR-8, ATR-12, SMW-1 —quarterly; <br /> wells ATR-1, ATR-3,'ATR-6, ATR-9, <br /> ATR-10, ATR-11 — semi-annually 4 <br /> E <br /> (1st and 3rd quarters) <br /> Frequency of Groundwater Monitoring: : Quarterly r <br /> F <br /> Is Free Product(FP) Present On-Site: Yes <br /> Approximate Depth to Groundwater(below TOC): 7.87 ft (ATR-8) to 12.10(ATR-3) <br /> Groundwater Flow Direction: ;: East <br /> Approximate Hydraulic: 0.002 , r <br /> This report was prepared in accordance with the standards of the environmental consulting industry at the time it was <br /> j� prepared It should not be relied upon by parties other than those for whom it was prepared,and then only to the extent � <br /> J of the scope of work which was authorized. This report does not guarantee that no additional environmental <br /> contamination beyond that described in this report exists at the site. <br /> 33 t"EPORTSM 8796QTR.DOC <br /> r 3 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.