My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
3500 - Local Oversight Program
>
PR0545738
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:46:47 AM
Creation date
6/8/2020 11:40:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545738
PE
3528
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 0 INTRODUCTION <br /> This document is intended to fulfil'_ all the requirements for a 1 <br /> Corrective Action Plan for Chevron Station 9-8264, as requested by <br /> San Joaquin County. The service station is located at 3775 Tracy <br /> Boulevard in Tracy, California (Figure 1) . On November 7, 1995 , <br /> underground storage tanks (US?sj and surface facilities for service- <br /> station operations were removed. Furthe.= renovation work is <br /> pending. <br /> The scope of work proposed in this work plan includes: <br /> * Preliminary Site Assessment I <br /> * Sail/Groundwater investigation <br /> Soil Excavation <br /> A Proposal for Verification Monitoring <br /> Further corrective action measured may be necessary depending on <br /> findings from the activities proposed in this workplan. <br /> 2 . 0 SITE CONDITIONS <br /> The site is an operating service station awaiting renovation. The <br /> station was constructed in 1972 , and the original USTs (tw6-10 , 000 <br /> gallon and one-6 , 000 gallon capacity for gasoline and one-1500 <br /> gallon for used oil) were removed on November 7, 1995 . All USTs <br /> have tested "tight" since 1986 . Depth .to groundwater has beer, <br /> observed at 10 feet below grade surface (bgs) . � <br /> 3 . 0 SCOPE OF WORK <br /> 'I <br /> A combination of site assessment and soil remediation_ will be <br /> performed concurrently. Soil remediation will occur by excavation <br /> as obvious areas of hydrocarbon impacted soil are axposed and <br /> overexcavated during construction activities. Additional site <br /> assessment will follow construction, with the installation of four <br /> soil borings and four monitoring wells, positioned to help <br /> determine lateral and vertical extent of any residua'_ contamination <br /> (Figure 2 ) . <br /> rLA, <br /> X <br />
The URL can be used to link to this page
Your browser does not support the video tag.