Laserfiche WebLink
STANDARD OPERATING PROCEDURE - <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory Prior to sample collection;the type of <br /> analysis to be performed is determined Loss prevention of volatile compounds is controlled and sample <br /> preservation for subsequent analysis is maintained <br /> Prior to sampling, the presence or absence of free-phase hydrocarbons is determined using an interface <br /> probe Product thickness, if present, is measured to the nearest 0 01 foot and is noted in the field notes <br /> In addition,all depth to water level measurements are collected with a static water level indicator and are <br /> also recorded in the field notes, prior to purging and sampling any wells <br /> After water levels are collected and prior to sampling, if purging is to occur, each well is purged a <br /> minimum of three well casing volumes of water using pre-cleaned pumps(stack, suction,Grundfos),or <br /> disposable bailers Temperature,pH and electrical conductivity are measured a minimum of three times <br /> during the purging Purging continues until these parameters stabilize <br /> Groundwater samples are collected using disposable bailers The water samples are transferred from the <br /> bailer into appropriate containers Pre-preserved containers, supplied by analytical laboratories,are used <br /> when possible When pre-preserved containers are not available, <br /> the laboratory is instrueted to prtse .1c <br /> the sample as appropriate Duplicate samples are collected for the laboratory to use in maintaining <br /> quality assurance/quality control standards The samples are labeled to include the job number, sample <br /> identification,collection date and time,analysis,preservation(if any and the sample collector's initials------— <br /> The water samples are placed in a cooler, maintained at 4°C for transport to the laboratory Once <br /> collected in the field;all samples are maintained under chain of custody until delivered to the laboratory <br /> The chain of custody document includes the job number,type of preservation, if any,analysis requested, <br /> sample identification, date and time collected, and the sample collector's name The chain of custody is <br /> signed and dated (including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel <br /> -A laboratory supplied trip blank accompanies each sampling_set For sampling sets greater than 20 <br /> samples, 5%trip blanks are included The trip blank is analyzed for some or all of the same compounds <br /> as the groundwater samples <br /> As requested by Chevron Environmental Management Company, the purge water and <br /> decontamination water generated during sampling activities is transported by IWM to Chemical <br /> Waste Management located in Kettleman Hill, California <br /> N,1CaLfomaSformslchevron-SOP-JAN 2006 <br />