My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007327
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
3500 - Local Oversight Program
>
PR0545738
>
ARCHIVED REPORTS_XR0007327
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 12:08:56 PM
Creation date
6/8/2020 11:50:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007327
RECORD_ID
PR0545738
PE
3528
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> Date July 13,2001 r t lir r , ,. �, . , , : II sECOR <br /> Internataonallncorporated <br /> 01 JUL 16 PM 2: 25 <br /> CHEVRON GROUNDWATER MONITORING REPORT (2Q2001) <br /> Primary Agency Sam Savig <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No 9-8264 Address 3775 Tracy Boulevard,Tracy,California <br /> CHEVRON Project Manager Robert Cochran <br /> Consulting Co/Contact Person SECOR International, Inc — William Brasher <br /> Consultant Project No 077 43461 020 <br /> Assembly Bill 681 Status Property Owner Chevron Products Company <br /> WORK PERFORMED THIS QUARTER: Second Quarter—2001: <br /> 1 Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted groundwater monitoring report <br /> 3 Prepared and submitted work plan for additional site assessment activities <br /> WORK PROPOSED FOR NEXT QUARTER. Third Quarter- 2001: <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit groundwater monitoring report <br /> 3 Perform additional site assessment activities <br /> QUARTERLY RESULTS SUMMARY- <br /> Current Phase of Project Monitoring and Samphng/Site Assessment <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP) Present On-Site No <br /> Current Remediation Techniques N/A <br /> Approximate Depth to Groundwater 9 to 10 S feet <br /> Groundwater Gradient Northeast @ 0 002 to 0 00.1 filft <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CR 95670 916 861 0400 916 861 0430 Fax muw secor com <br />
The URL can be used to link to this page
Your browser does not support the video tag.