Laserfiche WebLink
1t I <br /> SCALE (ft) p I <br /> I MW-1 <br /> 846 F <br /> 0 40 ARMER USED <br /> C: OIL UST <br /> I <br /> LQ <br /> LQ <br /> SUMP H IST <br /> w Q STATION S <br /> N BUILDING a <br /> w <br /> W <br /> 17 I <br /> I Mw-2 <br /> FORMER PUM B- $ 20 <br /> ISLAND (TYP) <br /> NEW PUMP <br /> ISLAND (TYP) • 8-1 <br /> MW-4 <br /> 846 • B-3 <br /> I <br /> FORMER FUEL I �ILj <br /> UNDERGROUND <br /> STORAGE TANKS <br /> (UST) I I <br /> NEW FUEL <br /> • B-4 LU UST's <br /> PLANTER MW-3+ <br /> 8 27 — — <br /> TRACY BOULEVARD <br /> EXPLANATION <br /> MONITORING WELL <br /> • SOIL BORING <br /> 827 GROUNDWATER ELEVATION (FT, MSL) <br /> cr STEVEN E KRGIK <br /> 8 30 GROUN�+ APPRODMATERELEVATION GR GROUNDWATER FLOW R976 <br /> DIRECTION, <br /> 1 <br /> APPROXIMATE GRADIENT = 0 002 <br /> 1 <br /> Msemap Irom Touchstone Demo opmenp Dn mnmentol Management <br /> PREPARED Hy Chevron Station 9-8264 FIGURE: <br /> 3775 Tracy Boulevard <br /> RLP%M Tracy, California <br /> engineering contracting firm GROUNDWATER ELEVATION CONTOUR MAP, PROJECT <br /> QgCg4 <br /> AUGUST 10, 1998 <br />