Laserfiche WebLink
sample will be collected from boring ACS-3 along the eastern side of the site also <br /> using the Hydropunch/Powerpunchdevice With the hydropunch sampling operations, <br /> a sampling chamber is advanced into the soil to the desired depth The sampling <br /> chamber is then opened to allow groundwater to enter the chamber Upon retraction <br />' of the sampling chamber from the soil, the water sample is then transferred to <br /> appropriate sample preservation containers The two water samples will be <br /> transported to a state-certified laboratory, and they will be analyzed as shown in <br /> ' Table 2 <br /> ' TABLE 2 <br /> GROUNDWATER SAMPLE ANALYSIS <br /> Bor No EPA Method 8240 and 8270 TPH-G & BTEX Oil & Grease <br /> ' Chlorinated Halocarbons <br /> ' ACS-3 X <br /> WB-1 <br /> Eafl X X X <br /> ' 34 TASK 3. REPORT PREPARATION <br /> The findings of Tasks 1 through 3 will be summarized into a brief report which will <br /> state all field and laboratory procedures used, give results of analyses performed, and <br /> interpret those results. <br /> 1 4.0 SCHEDULE <br /> The proposed scope of work will commence within 2 weeks of receiving approval of <br /> the workplan. Field activities are estimated to be performed in 1 day. With a 2 week <br /> ' turnaround for laboratory analyses, the report will be completed within 6 weeks of <br /> ' approval of this workplan. <br /> 2169WPOl wPw.rAwv 1995 4 Mittelhauser, <br /> C 0 R P 0 R A 7 1 0 N <br />