Laserfiche WebLink
sample will be collected from boring ACS-3 along the eastern side of the site also <br /> using the Hydropunch/Powerpunch device With the hydropunch sampling operations, <br /> a sampling chamber is advanced into the soil to the desired depth The sampling <br /> chamber is then opened to allow groundwater to enter the chamber Upon retraction <br /> of the sampling chamber from the soil, the water sample is then transferred to <br /> ' appropriate sample preservation containers The two water samples will be <br /> transported to a state-certified laboratory, and they will be analyzed as shown in Table <br /> 2 <br /> TABLE 2 <br /> GROUNDWATER SAMPLE ANALYSIS <br /> Bor No EPA Method 8240 and 8270 TPH-G & BTEX Oil & Grease <br /> ' Chlorinated Halocarbons <br /> ' ACS-3 X <br /> WB-1 X X X <br /> 34 TASK 3 REPORT PREPARATION <br /> The findings of Tasks 1 through 3 will be summarized into a brief report which will <br />' state all field and laboratory procedures used, give results of analyses performed, and <br /> interpret those results <br /> 4.0 SCHEDULE <br /> The proposed scope of work will commence within 2 weeks of receiving approval of <br />' the workplan Field activities are estimated to be performed in 1 day With a 2 week <br /> turnaround for laboratory analyses, the report will be completed within 6 weeks of <br />' approval of this workplan <br /> z,88WP0,wpU.nuuy,896 4 �ittelhauser <br /> C p RPO RATIO N <br />