My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007608
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3788
>
3500 - Local Oversight Program
>
PR0545739
>
ARCHIVED REPORTS_XR0007608
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 12:27:31 PM
Creation date
6/8/2020 12:15:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007608
RECORD_ID
PR0545739
PE
3528
FACILITY_ID
FA0006002
FACILITY_NAME
UNION OIL #6348
STREET_NUMBER
3788
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21225002
CURRENT_STATUS
02
SITE_LOCATION
3788 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sample will be collected from boring ACS-3 along the eastern side of the site also <br /> using the Hydropunch/Powerpunch device With the hydropunch sampling operations, <br /> a sampling chamber is advanced into the soil to the desired depth The sampling <br /> chamber is then opened to allow groundwater to enter the chamber Upon retraction <br /> of the sampling chamber from the soil, the water sample is then transferred to <br /> ' appropriate sample preservation containers The two water samples will be <br /> transported to a state-certified laboratory, and they will be analyzed as shown in Table <br /> 2 <br /> TABLE 2 <br /> GROUNDWATER SAMPLE ANALYSIS <br /> Bor No EPA Method 8240 and 8270 TPH-G & BTEX Oil & Grease <br /> ' Chlorinated Halocarbons <br /> ' ACS-3 X <br /> WB-1 X X X <br /> 34 TASK 3 REPORT PREPARATION <br /> The findings of Tasks 1 through 3 will be summarized into a brief report which will <br />' state all field and laboratory procedures used, give results of analyses performed, and <br /> interpret those results <br /> 4.0 SCHEDULE <br /> The proposed scope of work will commence within 2 weeks of receiving approval of <br />' the workplan Field activities are estimated to be performed in 1 day With a 2 week <br /> turnaround for laboratory analyses, the report will be completed within 6 weeks of <br />' approval of this workplan <br /> z,88WP0,wpU.nuuy,896 4 �ittelhauser <br /> C p RPO RATIO N <br />
The URL can be used to link to this page
Your browser does not support the video tag.