Laserfiche WebLink
I <br /> 7 <br /> TABLE OF CONTENTS <br /> Section Page No <br />•! <br /> EXECUTIVE SUMMARY ES-1 <br /> 1 0 INTRODUCTION 1 <br /> 20 PREVIOUS INVESTIGATIONS AND REMEDIATION ACTIVITIES 1 <br /> 3 0 HYDROGEOLOGIC SETTING 2 <br /> 40 SITE DEMOLITION AND REMEDIATION 3 <br /> 4 1 Removal and Over-excavation of the USTs 3 <br /> 42 Removal of the Product Lines 5 <br /> 43 Removal and Over-excavation of the Pump Islands 5 <br /> 44 Removal of the Septic Tank 6 <br /> 45 Removal of the Service Bay Hoists 6 <br /> 46 Location and Status of Former Water Supply Well 7 <br /> 47 Excavated Soil Stockpiles 7 <br /> 50 INSTALLATION OF WELL MW-3A 7 <br /> 60 CONCLUSIONS 8 <br /> 7 0 RECOMMENDATIONS $ <br />.r <br /> 80 LIMITATIONS 9 <br /> FIGURES <br /> FIGURE 1 LOCATION MAP <br /> FIGURE 2 PREDEMOLITION SITE PLAN <br /> FIGURE 3 SOIL SAMPLE LOCATION MAP <br /> TABLES <br /> TABLE 1 SUMMARY OF GROUNDWATER ANALYTICAL RESULTS <br /> TABLE 2 SUMMARY OF ANALYTICAL RESULTS FOR SOIL SAMPLES <br /> APPENDICES <br /> APPENDIX A PRELIMINARY INVESTIGATION AND EVALUATION REPORT <br /> DATED JANUARY 31 , 1992 <br /> APPENDIX B MONITORING WELL MW-3A INSTALLATION REPORT <br /> DATED DECEMBER 3, 1993 <br /> APPENDIX C LABORATORY ANALYTICAL REPORTS <br /> Is / Aittelhauser <br /> 0 R P 0 R n T 1 0 k <br /> P2166R006 wp1031941 <br />