Laserfiche WebLink
Mr Edward C Ralston December 3, 1993 <br /> Page Number 2 <br /> organics with a L,eid operated photolonization detector (PID) There were no field <br /> indications of petroleum hydrocarbons In any of the soil samples Therefore, no <br /> samples were sunmitted for laboratory analysis The sods generated from the drilling <br /> activity are storey onsite In a 55-gallon drum pending laboratory analysts for disposal <br /> Well MW-3A was developed on December 1 , 1993 using a surge block and a baler <br /> The development water is stored onsite in a 55-gallon DOT-approved drum pending <br /> analysis for disposal Groundwater samples will be obtained from the well for <br /> laboratory analysis during the regular quarterly monitoring program at the site <br /> If you have any questions or comments, please give us a call at (510) 416-2902 <br /> Sincerely, <br /> MITTELHAUSER CORPORATION <br /> Steven W Pierce David J Blunt <br /> Senior Hydrogeologtst �° ���0 Geoscience Manager, RG #4516 <br /> SWP OJ6/dlp �� 7?1 <br /> P21 BBFL005 WP <br /> OF caX\F�`�� <br /> Attachment. Figure 1 - Site Location Map <br /> Permit For Well MW-3A <br /> Figure 2 - Site Plan <br /> Boring for Well MW-3A <br /> Well Construction Details for Well MW-3A <br /> cc Mr Harlin Knoll, San Joaquin County Public Health Services <br />• <br />