Laserfiche WebLink
MITTELHAUSER <br /> corporation PAGE , t _ OF �_ <br /> BORING NO. j=12 PROJECT NO 1743-01 PROJECT NAME UNOc& IRACy <br /> BORING LOCATION 3768 TRACY BDULEVMM TRACY ELEVATION AND DATUM <br /> DRILLING AO CY• DRILLER DATE a Tm DATE &11Z FIM <br /> 7/16/91 11 39 7/13/61 1310 <br />' DRILLING EQUIPWENT _ <br /> LOGGED BY CHECKED BY <br /> COMPLETION DEPTH BEDROCK DEPTH <br /> We <br /> IFIRST WATER DEPTH NOT ENCOWTERED NO, OF <br /> DESCRIPTION REMARKS <br />' Asphalt, 1 blown $and <br /> 3.a ►0 4.0 and a a m &D Intarvdo <br /> sampled using a hand auger <br /> SlL1Y CLAY (014). medium hrown/lighl brown mottled CN <br />' m rkh gray @taloa, <br /> lat <br /> SAND (SC), 9ght gray, molaL SC <br />' SILTY CLAY (CL). gray. CL <br /> 5 molal. <br /> 10 <br />' 0 <br /> Baring termtoaNd at &D—foot dapth. <br /> 10 <br />' 15 <br />' 20 <br /> I <br />' 25 <br />