Laserfiche WebLink
M 1TTELHAUSER <br /> I corporation PAGE OF �1_ <br /> BORING NO PROJECT NO 1745--01 PROJECT KAME UNOCAL TRACY <br /> BORING LOCATION ELEVATION AND DATUM <br /> DATE & Tia STARED, DATE 6 TYIE FINISIEW <br /> DRILLING AGENCY DRILLER mATr amn <br /> 7/23/91 8 55 7/23/81 9.15 <br /> I DRILLING EOUIPMENT — CHECKED BY <br /> LOGGED 8Y <br /> COMPLETION DEPTH BEDROCK DEPTH Mar ENCO&MM <br /> MMB <br /> IFIRST WATER DEPTH NOT ENCOUNTEFED NQ. OF PLES. <br /> DESCRIPTION REMARKS <br /> n <br /> H l <br /> SAND (SC) fls, brown, SC Samples were collected using <br /> �C=Wrawn.————————--- a Z i/2' OD CdNomio mod ftd <br />' — by g9D ——— �._ —. e exon rampNr lined Vim <br /> SAND (SC), brown, SC braes tubes driven a 1A0 <br /> mciaL daMn—hale hammw 1dIM2 <br /> CLAY (C1), gray. CH 12 <br /> gyp, 17 21 <br /> ly�Iaant fowl, 28 <br /> 5 Aght hydrocarbon odor <br /> I x At 8' depth becomes brown/gray mottled <br /> 12 <br /> 22 17 <br /> 37 <br /> 1 O <br /> Borehole terminated at 95 feet. <br /> 20 <br />' 25 <br /> 1 <br /> 1 � <br />