My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1
>
3500 - Local Oversight Program
>
PR0545764
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 9:51:58 AM
Creation date
6/9/2020 9:47:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545764
PE
3528
FACILITY_ID
FA0005330
FACILITY_NAME
ISC WINES OF CALIFORNIA INC
STREET_NUMBER
1
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95424
CURRENT_STATUS
02
SITE_LOCATION
1 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jn Thorpe `, oii, 1n6d, <br /> .O. 1319x 357 • Lodi, CA 85241 <br /> 351 'N. Beckman Road • I' <br /> 12091366-6175 • (209) 462-4581 <br /> Contractor's license 1495699 <br /> May 8, 1992 <br /> i <br /> c San Joaquin Health Services <br /> P. 0. Box 2009 <br /> Stockton, CA 95201 <br /> RE: SOIL REMEDIATION WORK PLAN <br /> 1 . A. Owner of Property: Ford Construction Compdny, Inc./Jim Thorpe ail , Inc. <br /> B. Address of Site . 1 W. Turner Road, -Lodi , CA <br /> C. Contact Person . Richard Thorpe {209} 462-4581 <br /> 2. A. Scale Drawings Attached <br /> 3. A. History of Site Attached ' <br /> B. Contaminants Diesel fuel ' and Bunker C <br /> 4. A. Groundwater Depth: 45 feet <br /> B. Soil Removed Approximately between 6,000 and 8,000 cubic yards <br /> uction Company, .Inc. and Jim Thorpe Oil , <br /> C. Remediation Plan Ford Constr <br /> Inc. in conjunction with Terra 'Environmental plan a bio-remediation <br /> process as the final environmental site mitigation step in order to <br /> achieve closure at the above mentioned location. This process will <br /> include the use of a Barber-Greene 3 ton soil mixing pug mill equipped <br /> with a metered liquid injection system, a grizzly type screening plant, <br /> 11 <br /> two conveyor belts and two wheel type front loaders. Pug mill and <br /> conveyor belts will be powered :::'by a portable diesel powered generator. <br /> City water is available on sit#. A steel tank of .1 ,500 galloncapacity <br /> will be used to mix microbes and water. A second steel tank. of 1 ,500 <br /> to 2,000 gallon capacity will be ,used to mix nutrients and water. Pumps <br /> may be powered by electricity, ,or portable gasoline and/or diesel engines: <br /> Six mil plastic sheeting will �e used under the mixed soil . There may be, <br /> more equipment needed to complete the process, however; the pieces men- <br /> tioned are the basic implements. <br /> Virtually all soil handled during the "bio" process will contain <br /> enough moisture that a problem'�of blowing of 'dust.wi11 not occur. If <br /> the need arises for dust control , a water. truck will be brought on job <br />
The URL can be used to link to this page
Your browser does not support the video tag.