Laserfiche WebLink
- `` Re: Soil Remediation Work Plan <br /> W ° <br /> 1 . Turner Road, Lodi , CA <br /> �R. -- - - - - - - - - - - <br /> Fifth: Actual mixing process wi:p take 10 days to 2 weeks. After <br /> a relative amount of time, perhaps 7 days, a preliminary set of <br /> soil samples will be taken to monitor the remediation process. <br /> Non-detectable levels of hydrocarbon will be strived for; however, <br /> levels of less than 100 ppm With no benezene, toluene, ethylbenezene, <br /> and xylene will be acceptable according to page 29 ".Leaching Potential <br /> Analyses" in the LUFT manual . In the final analyses, 10 samples, <br /> using' a minimum of 8 composits per sample, will be used in determining <br /> the levels remaining in the pile. Composits will be taken from the <br /> pile systematically on a grid spaced evenly over the piles. The exact <br /> grid can be laid out after the new 'piles are built. <br /> Sixth: After remediation and acceptance by the lead agency, all .soil <br /> C <br /> will remain on site and be usedL' in the developement planned for this . <br /> location. <br /> Extimated total amount of time ,to complete the entire remediation <br /> 5 <br /> work is 60 to 120 days from start up. <br /> T & T Earth Services, Jackson, CA (209) 267-0903 will be the <br /> analytical laboratory. Terra E�nviornmental will supply the final <br /> report for county approval . Technical information regarding microbe <br /> function will be supplied by Terra Environmental ... <br /> Respectfully submitted, <br /> FORD CONSTRUCTION COMPANY, INC. <br /> Ward <br /> RPOIL, NC.Thorpe, 0 ner Repr entative <br /> Attachments: <br /> A. Health and Safety Plan <br /> B. Authorization to Release <br /> C. Copy of Foothill Engineering Classification of Contaminated Soils <br /> from the' ISC Winery ;E <br /> D. Copy of Jim Thorpe Oil site summary/history <br /> E. Drawing Figure- 1 - Site location'tmap <br /> F. Drawing Figure 2 - Plan of existing spoil and proposed work area <br /> G. Drawing Figure 3 - Plan of proposed treatment locations <br /> H. Copy of San Joaquin Air Pollution Control District letter <br /> I. Terra Environmental Technical Information MSDS information and USDA <br /> approved information <br /> 5 <br />